Approved by the Tianjin Municipal People’s Government, the southern section of Tianjin Metro Line 4 (Southeast Corner Station-Xinxingcun Station), the second phase of Line 6 (Lushuidao Station-XianshuiGuxi Station), the two lines will be officially opened for initial operation on December 28, 2021. After its opening, Tianjin’s rail transit network will increase to 265 kilometers, the number of operating stations will increase to 164, and the number of transfer stations will increase to 19.
The southern section of Tianjin Metro Line 4 starts from the southeast corner station of Nankai District in the north, to Xinxingcun Station in Dongli District in the east, and passes through the five administrative districts of Nankai, Heping, Hexi, Hedong and Dongli along the way. The main line has a total length of 19.4 kilometers and a total of 14 stations.
The second phase of Tianjin Metro Line 6 is the first fully automatic operation line in Tianjin. The main line is about 14.39km long and has 9 stations, passing through the Hexi and Jinnan administrative regions. After the second phase of line 6 is opened, it will effectively facilitate the teachers and students of Haihe Education Park and residents of Jinnan Xianshuigu Town, Shuanggang Xinjiayuan and other places Travel to promote the coordinated development of Jinnan District and the central city.